Determine the measurement from the
finished grade to the foundation footing.
Refer to the table below to select the
proper size. The top of the casting should be a minimum of 2" above the
finished grade.
Double check the PermEntry Job Site
Requirements and check site to determine if there is proper truck access
to and from the PermEntry installation area.